Tribe UNLTD

CASE STUDY / MUNICIPAL UTILITY / WEBSITE DESIGN

CITY OF REDLANDS
WASTEWATER DEPARTMENT

A public wastewater utility given a site that four different audiences can use — residents, businesses, licensed haulers and people looking for work — without reading past what they came for.


CLIENT
City of Redlands
SECTOR
Municipal / Wastewater Utility
SERVICES
Web Design · UX/UI · Brand Application
OBJECTIVE
Clarity · Access · Public Trust

A department of the City of Redlands  /  Nine public pages covering services, projects, careers and contact

City of Redlands Wastewater Department homepage: 'Protecting Public Health and the Environment' over an aerial view of a treatment clarifier

The homepage states what the department is responsible for, then opens directly into the services residents, businesses and developers arrive looking for — rather than making them hunt through a menu.

THE OPPORTUNITY

ESSENTIAL SERVICES
DESERVE A CLEAR
FRONT DOOR.

Wastewater is infrastructure most people never see — until they need a permit, a plan or a phone number. The objective was a site that makes complex services and regulatory information feel credible and navigable, with clear routes to contact and documents.

About page with the history of the Redlands wastewater department beside an aerial photograph of treatment ponds

About — the department's history, from the 1920s “Sewer Farm” to the relocated treatment facility.

THE EXPERIENCE STRATEGY

ORGANIZE BYWHAT PEOPLECOME TO DO.

Residents, businesses, licensed haulers and job seekers each arrive with a different task. The structure routes them to the right page quickly, and every page ends in the action that completes the job.

Services page introducing the range of wastewater department services above aerial imagery of treatment ponds
  1. 01

    UNDERSTAND

    See what the department is responsible for.

  2. 02

    LOCATE

    Find the right service or program.

  3. 03

    APPLY

    Permits, applications and forms.

  4. 04

    REACH

    Contact, careers and emergencies.

VISUAL LANGUAGE

CIVIC,
NOT CORPORATE.

The city's established orange and seal stay exactly as they are. Questrial keeps the voice open and contemporary; a tightened type scale and a single grid give nine pages one rhythm instead of nine.

City of Redlands wordmark

01 / CITY WORDMARK

City of Redlands seal

02 / CITY SEAL

The page-opening treatment: a photograph of the treatment facility running full width

03 / PAGE OPENING


COLOR

The city's orange carries actions and wayfinding; photography of the plant itself does the rest of the work.

REDLANDS ORANGE#FD5521

INK#111111

PAPER#F4F2EF

WHITE#FFFFFF


QUESTRIAL  /  DISPLAY   +   QUESTRIAL  /  INTERFACE

Aa

QUESTRIAL / DISPLAY

ABCDEFGHIJKLM abcdefghijklm 1234567890
Protecting public health and the environment.

Aa

QUESTRIAL / INTERFACE

ABCDEFGHIJKLM abcdefghijklm 1234567890
Download the application. Call the department.

SELF-SERVICE JOURNEYS

FROM QUESTION
TO DOCUMENT.

Service-specific pages carry their own information architecture: a short orientation, the downloadable document up front, and the detail underneath for anyone who needs it. The page ends where the task ends.

FIND THE SERVICEDOWNLOAD THE PERMITCALL THE DEPARTMENT

Liquid Waste Hauler Disposal Services page with a Download Application button over an outfall pipe photograph

LIQUID WASTE HAULER DISPOSAL

A permit that starts with a download.

Haulers land on a single purpose-built page: what the disposal service covers, a Download Application button above the fold, and direct contact instructions for getting set up.

Wastewater Collection System page with aerial treatment-pond imagery and buttons for the Emergency Response Plan and System Management Plan

WASTEWATER COLLECTION SYSTEM

System information, then the plans.

The page explains the city's publicly owned treatment works and collection network, with the Emergency Response Plan and System Management Plan one click from the page header.

ACCESS / CAREERS, CONTACT, ABOUT

THE PAGESPEOPLE ARRIVELOOKING FOR.

Six open roles sit on an even three-by-three grid with the application pinned to a shared baseline. Contact leads with a form and a number. About carries the department's history and its laboratory.

04 / CAREERS • DESKTOP

Careers page with six open roles on an even grid

05 / CONTACT

Contact page leading with a form and a phone number

06 / ABOUT • DESKTOP

About page carrying the history of the City of Redlands Wastewater Department, from the 1920s Sewer Farm to the relocated treatment facility

RESIDENTS     BUSINESSES     LICENSED HAULERS     JOB SEEKERS

INFRASTRUCTURE, EXPLAINED

THE PLANT,THE LAB AND THEPIPES BENEATH.

About page section on the certified City of Redlands Wastewater Laboratory beside a photograph of plant piping

Long-form history, facility details and the city's certified environmental laboratory are given room to read like reference material, not marketing.

FACILITY & SYSTEM FACTS, AS PUBLISHED ON THE SITE


~50
ACRE TREATMENT FACILITY
9.5M
GALLONS / DAY RATED CAPACITY
250
MILES OF COLLECTION LINES

Figures describe the city's infrastructure. Tribe designed the website, not the water systems.

ONE MOVE, NINE PAGES

A SINGLEOPENING THATTIES IT TOGETHER.

Every interior page opens the same way: a photograph of the department's own infrastructure running full width behind a transparent header, with the page title on a white card over it. Nine pages read as one site.

Liquid Waste Hauler page opening

01 / LIQUID WASTE HAULER

Wastewater Collection System page opening

02 / WASTEWATER COLLECTION

Careers page opening

03 / CAREERS

THE SAME OPENING APPLIED ACROSS THE INTERIOR PAGES

WHAT THE WORK ENABLES

A SITE THEDEPARTMENTCAN STAND BEHIND.

The department now has a public site that explains what it does, routes four audiences to the right page, and gives every interior page the same opening. Six of the nine pages now carry a mobile design as well.


09

PUBLIC PAGES

PAGES DESIGNED

Home, About, Services, Projects, Careers, Contact and three service pages.


04

AUDIENCES ROUTED

WHO THE SITE SERVES

Residents, businesses, licensed haulers and job seekers, each with a route to their own task.


01

OPENING MOVE

APPLIED ACROSS THE SITE

A full-bleed photograph behind a transparent header, repeated on every interior page.

ABOUT   ·   SERVICES   ·   COLLECTION SYSTEM   ·   HAULER PERMITS   ·   PROJECTS   ·   CAREERS   ·   CONTACT


SCOPE, NOT OUTCOMES

09, 04 and 01 describe what was designed — not measured changes in traffic, applications or service requests. Those can be evaluated once the site is live and instrumented.